100% Outside Air

Multi-Chem, Global

, , ,

This was a renovation of an existing lab that required an additional amount of outside air for pressurization. Six Valent VPR packaged units with side discharge duct connections were installed on pads outside of the building to accommodate the laboratory’s stringent temperature and humidity requirements.

Project Name: Multi-Chem, Global
Location: Houston, TX
Owner: East Group Property
Architect: N/A
Mechanical Engineer: […]

Fire Station #84

, , , ,

Located in North Houston, the 15,500 sqft Fire Station #84 is the first of its kind to utilize geothermal water source heat pumps for its air conditioning and heating system. The City of Houston decided to include this feature to provide the most efficient HVAC system available with the least amount of maintenance required. […]

Emancipation Park

, , , , ,

Presently located in the third ward of Houston, in 1872, Emancipation Park was purchased by former slaves for $800 down, for 10 acres of land, later to become the home for their Juneteenth celebration. In honor of their freedom they named it Emancipation Park. In 1918, the park was acquired by the city of […]

United Airlines

, ,

A Valent packaged rooftop unit was installed to provide temperature and humidity control in United Airlines’ new 787 Dreamliner service facility at the George Bush Intercontinental Airport.

Project Name: United Airlines B787 Tooling Room Upgrade
Location: Houston, TX
Owner: United Airlines
Architect: Frankfurt Short Bruza
Mechanical Engineer: Frankfurt Short Bruza
Mechanical Contractor: Raven Mechanical
Manufacturer(s): Valent

Sam Rayburn High School

, ,

Valent Packaged rooftop units with gas heat, modulating hot gas reheat and modulating compressors applied to deliver dehumidified air for the school’s competition gymnasium.

Project Name: Sam Rayburn High School
Location: Pasadena, TX
Owner: Pasadena ISD
Architect: cre8 Architects
Mechanical Engineer: Kalmans Marshall Engineering
Mechanical Contractor: Mesa Mechanical
Manufacturer(s): Valent

South Houston High School

, ,

Valent packaged rooftop units with gas heat, modulating hot gas reheat and modulating compressors applied to deliver dehumidified air for the school’s competition gymnasium.

Project Name: South Houston High School
Location: South Houston, TX
Owner: Pasadena ISD
Architect: cre8 Architects
Mechanical Engineer: Kalmans Marshall Engineering
Mechanical Contractor: Mesa Mechanical
Manufacturer(s): Valent

St. Joseph Regional Health Center

, , ,

An Innovent custom air unit with desiccant cooling with leaving air conditions of 25 grains/# was provided as part of a retrofit project to dramatically reduce the operating room humidity levels at St. Joseph Regional Health Center.

Project Name: St. Joseph Regional Health Center
Location: Bryan, TX
Owner: St. Joseph Health System
Architect: N/A
Mechanical Engineer: Garner Fritsche Engineering
Mechanical Contractor: […]

Sheldon ISD Garrett Elementary

, , , , ,

Chosen as the basis of design, ClimateMaster geothermal water source heat pumps were provided for this LEED project. Sheldon ISD was awarded over $72,000 from CenterPoint Energy’s SCORE program for energy efficiency.

[…]